Project Three

At a projects inception Atco Engineering was asked to provide a design concept on a frame assembly where overall dimensional tolerance was within +/-0.3 and minimised material waste. Furthermore, over 1,000 units would be required within 8 weeks once the final design was approved. Through this process Atco Engineering manufactured prototypes for physical evaluation by … Continue reading Project Three